当前位置:首页 > 电源 > 数字电源
[导读]Figure 1 shows a typical application using the LTC1421. The LTC1421 works best with a staggered, 3-level connector. Ground makes connection first to discharge any static build-up. VCC, VDD and VEE

Figure 1 shows a typical application using the LTC1421.
The LTC1421 works best with a staggered, 3-level connector.
Ground makes connection first to discharge any static
build-up. VCC, VDD and VEE make connection second and
the data bus and all other pins last. The connection sense
pins CON1 and CON2 are located on opposite ends of the
connector to allow the board to be rocked back and forth
during insertion.

,LTC and LT are registered trademarks of Linear Technology Corporation.

The power supplies on the board are controlled by placing
external N-channel pass transistors Q1, Q2 and Q3 in the
power path for VCC, VDD and VEE, where VCC and VDD can
range from 3V to 12V, and VEE from – 5V to – 12V. By
ramping up the voltage on the pass transistors’ gates at a
controlled rate, the transient surge current [I = (C)(dv/dt)]
drawn from the main backplane supply will be limited to a
safe value. The ramp rate is set by the value of capacitor C2.
The board’s data bus is buffered by a QS3384 QuickSwitch
from Quality Semiconductor. Disabling the QuickSwitch
via the DISABLE pin during board insertion and removal
prevents corruption of the system data bus.
Resistors R1 and R2 form an electronic circuit breaker
function that protects against excessive supply current.
When the voltage across the sense resistor is greater than
50mV for more than 20ms, the circuit breaker trips, immediately
turning off Q1 and Q2 while the FAULT pin is pulled
low. The device will remain in the tripped state until the POR
pin is pulsed low or the power on VCCLO and VCCHI is cycled.
The circuit breaker can be defeated by shorting VCCLO to
SETLO and VCCHI to SETHI.
The RESET signal is used to reset the system microcontroller.
When the voltage on the VOUTLO pin rises above
the reset threshold, PWRGD immediately goes high and
RESET goes high 200ms later. When the VOUTLO supply
voltage drops below the reset threshold, PWRGD immediately
goes low, and RESET goes low 60ms later, allowing
the PWRGD signal to be used as an early warning that a
reset is about to occur. When the FB is left floating, the reset
threshold is 4.65V; when the FB pin is tied to VOUTLO, the
reset threshold is 2.90V.
The uncommitted comparator and internal voltage reference,
along with resistors R6 and R7, are used to monitor
the 12V supply. When the supply drops below 10.8V, the
COMPOUT pin will go low. The comparator can be used to
monitor any voltage in the system.
Push-button switches S1 and S2 are used to generate a
hard and soft reset, respectively. A hard or soft reset may
also be initiated by a logic signal from the backplane.
Pushing S1 shorts the POR pin to ground, generating a
hard reset that cycles the board’s power. Pass transistors
Q1 to Q3 are turned off and VOUTLO and VOUTHI are actively
pulled to ground. When VOUTLO discharges to within 100mV
of ground, the LTC1421 is reset and a normal power-up
sequence is started.
Pushing S2 shorts the FB pin to ground, generating a soft
reset that doesn’t cycle the board’s power. PWRGD immediately
goes low, followed 64ms later by RESET. When S2  is released, PWRGD immediately goes high, followed 200ms
later by RESET.
Board Insertion Timing
When the board is inserted, GND pin makes contact first,
followed by VCCHI and VCCLO (Figure 2, time point 1).
DISABLE is immediately pulled high, so the data bus switch
is disabled. At the same time CON1 and CON2 make contact
and are shorted to ground on the host side (time point 3).
When CON1 and CON2 are both forced to ground for more
than 20ms, the LTC1421 assumes that the board is fully
connected to the host and power-up can begin. When
VCCLO and VCCHI exceed the 2.45V undervoltage lockout
threshold, the 20mA current reference is connected from
RAMP to GND, the charge pumps are turned on and CPON
is forced high (time point 4). VOUTHI and VOUTLO begin to
ramp up. When VOUTLO exceeds the reset threshold voltage,
PWRGD will immediately be forced high (time point
5). After a 200ms delay, RESET will be pulled high and
DISABLE will be pulled low, enabling the data bus (time point 6).

本站声明: 本文章由作者或相关机构授权发布,目的在于传递更多信息,并不代表本站赞同其观点,本站亦不保证或承诺内容真实性等。需要转载请联系该专栏作者,如若文章内容侵犯您的权益,请及时联系本站删除。
换一批
延伸阅读

9月2日消息,不造车的华为或将催生出更大的独角兽公司,随着阿维塔和赛力斯的入局,华为引望愈发显得引人瞩目。

关键字: 阿维塔 塞力斯 华为

加利福尼亚州圣克拉拉县2024年8月30日 /美通社/ -- 数字化转型技术解决方案公司Trianz今天宣布,该公司与Amazon Web Services (AWS)签订了...

关键字: AWS AN BSP 数字化

伦敦2024年8月29日 /美通社/ -- 英国汽车技术公司SODA.Auto推出其旗舰产品SODA V,这是全球首款涵盖汽车工程师从创意到认证的所有需求的工具,可用于创建软件定义汽车。 SODA V工具的开发耗时1.5...

关键字: 汽车 人工智能 智能驱动 BSP

北京2024年8月28日 /美通社/ -- 越来越多用户希望企业业务能7×24不间断运行,同时企业却面临越来越多业务中断的风险,如企业系统复杂性的增加,频繁的功能更新和发布等。如何确保业务连续性,提升韧性,成...

关键字: 亚马逊 解密 控制平面 BSP

8月30日消息,据媒体报道,腾讯和网易近期正在缩减他们对日本游戏市场的投资。

关键字: 腾讯 编码器 CPU

8月28日消息,今天上午,2024中国国际大数据产业博览会开幕式在贵阳举行,华为董事、质量流程IT总裁陶景文发表了演讲。

关键字: 华为 12nm EDA 半导体

8月28日消息,在2024中国国际大数据产业博览会上,华为常务董事、华为云CEO张平安发表演讲称,数字世界的话语权最终是由生态的繁荣决定的。

关键字: 华为 12nm 手机 卫星通信

要点: 有效应对环境变化,经营业绩稳中有升 落实提质增效举措,毛利润率延续升势 战略布局成效显著,战新业务引领增长 以科技创新为引领,提升企业核心竞争力 坚持高质量发展策略,塑强核心竞争优势...

关键字: 通信 BSP 电信运营商 数字经济

北京2024年8月27日 /美通社/ -- 8月21日,由中央广播电视总台与中国电影电视技术学会联合牵头组建的NVI技术创新联盟在BIRTV2024超高清全产业链发展研讨会上宣布正式成立。 活动现场 NVI技术创新联...

关键字: VI 传输协议 音频 BSP

北京2024年8月27日 /美通社/ -- 在8月23日举办的2024年长三角生态绿色一体化发展示范区联合招商会上,软通动力信息技术(集团)股份有限公司(以下简称"软通动力")与长三角投资(上海)有限...

关键字: BSP 信息技术
关闭
关闭