当前位置:首页 > 电源 > 功率器件
[导读]阐述了零电流开关(ZCS)技术在半桥变换器电路中的应用。从电路原理、各工作模态进行了分析,并给出了实验结果。

    摘要:阐述了零电流开关(ZCS)技术在半桥变换器电路中的应用。从电路原理、各工作模态进行了分析,并给出了实验结果。着重分析了主开关管和辅助开关管零电流开通和关断的过程及实现条件。该电路主要针对存在拖尾电流的IGBT设计,可以提高IGBT的工作频率。

    关键词:零电流开关;半桥变换器;谐振网络;IGBT

Introduction

In order to improve the whole efficiency of the electronic equipment, the search for more efficient soft switching technique has been developed. For switch such as IGBT,the zero- current switching(ZCS) and zero-current transition(ZCT)technology have been frequently used, because this method can reduce the current rapidly when IGBT turns off, therefore reducing the energy loss caused by the tail current [1][2][3][4][5].

But the zero-current switching circuit that mostly used is not input-out-isolated, so the application in the practice has not been generalized. This paper proposed the ZCS technique realized by the half? bridge converter, both the main switch and auxiliary switch in the topology work in soft? switching state, the turn-on current stress and turn-off voltage stress is small.

1 Operational Principles

Fig.1 shows the circuit diagram of the half-bridge converter. In the schematic, Lr1 to Lr4 are resonant inductors, the Cr is resonant capacitor, S1 and S2 are main switches, S3 and S4 are auxiliary switches, D1 to D4 are anti-parallel diodes in the switches, Cs1 to Cs4 are snubber-capacities. The circuit is the conventional half? bridge topology incorporating the auxiliary resonant tank that composed of switches S3 and S4. The zero current switching state can be obtained by controlling the work sequence of the switches. Fig.2 is the theoretical waveforms when the converter in steady-state operation.

Fig.1、2

The ideal analyses are given for all modes of the circuit, there are some differences between the theoretical analyses and practical condition because the following assumptions are made:

1)The link capacitor C1 and C2 in the half-bridge are so large that the voltage of the capacitors can be treated as a constant in each switching period.

2)The capacitor C3 is so large that there is little voltage reduction in C3.

3)The output filter inductor Lf is large enough that the current through it can be treated as a constant in each switching period.

4)The S1,S2,S3 and S4 are ideal switches.

5)The snubber-capacity Cs1,Cs2,Cs3 and Cs4 are much smaller than the resonant capacity Cr, so the influence on the resonance can be disregarded.

Additionally, the parameter meets the following:

6)The value of the leakage inductor Lk of the transformer is much larger than that of the resonant inductor.

7)The value of Lr1,Lr2,Lr3 and Lr4 is Lr.

8)The value of Cs1,Cs2,Cs3 and Cs4 is Cs.

9)The link capacitor C1 and C2 have the same values of C.

Just as conventional ZCS DC-DC converter circuit, the circuit can easily realize ZCS in light load condition. So the research and experiment in this paper are mainly concentrated in heavy load condition. To heavy load condition, the work process of the circuit can be sorted as following nine models:

Model 1〔 t0~t1〕 At t0, the switch S1 turns on, but the power is not delivered to the load because the transformer is shorted, the electric energy is only transfer to the leakage inductor Lk and resonant inductor Lr. So the current increase gradually from zero to Io/n (the n is the turn ratio of the transformer), the turn-on state of switch is zero current. The current conducting through S1 increases linearly with the slope of Uin/2(Lk+Lr), therefore the time interval of this model is given by

t1-t0=2(Lr+Lk)Io/(nUin)    (1)

Model 2〔 t1~t2〕 At t1, when the current through S1 is equal to Io/n, the power energy is delivered to the load, the circuit is in half-bridge converter PWM state. Then the current through S1 maintains to be Io/n.

Model 3〔 t2~t3〕 At t2, the auxiliary switch S3 turns on in zero-current state. The resonant tank composed of Lr1, Lr3 and Cr begins to work. If the voltage of Cr at t2 is uCr(t2), the voltage of Cr can be expressed as

uCr=uCr(t2)cos〔 ω 1(t-t2)〕    (2)

The current of Lr1 can be expressed as

iLr1=Im1sin〔 ω 1(t-t2)〕    (3)

where the resonant frequency ω 1 is given by

The maximum current of the Lr1 can be given by

Im1=uCr(t2)/ZLC    (5)

The impedance of the resonant ZLC can be given by

Model 4〔 t3~t4〕 At t3, the current through the resonant tank increases to Io/n, the current through S1 decreases to zero, the anti-parallel diode begins to work, because the current through resonant tank increases from zero, according to

i(t3)=Io/n     (7)

The time interval can be derived from

Model 5〔 t4~t5〕 At t4, when turning off the S1, the S1 is in zero-current state, but the anti-parallel diode is still in conducting state. The current through resonant tank decreases from Im1 to Io/n, The total time interval of model 4 and model 5 is

By the equation (2) and (9), the voltage of Cr at t5 can be expressed as

Model 6〔 t5~ t6〕 At t5, the current of resonant tank decreases to Io/n, the diode D1 turns off naturally, then the current through the resonant tank will keep to be Io/n, the voltage of S1 begins to increase, while the voltage of S2 to decrease.Because the capacitor discharges in constant current, so the voltage of resonant capacitor can be given as

From the equation(11) we can see that the voltage value of resonant capacitor increases gradually, at t6, to Uin/2. From equation (10) and (11), we know that the time interval of this model can be expressed as

Model 7〔 t6~ t7〕 At t6, the voltage of Cr begins to increase from Uin/2, the rectifier composed of D5 to D8 begins to conduct, the voltage of S2 continues to decrease. The resonant network is composed of inductor Lr3, resonant capacitor Cr and leakage inductor Lk, and the network cooperation with link capacitor C1, the initial state of the resonant network is

Therefore this model should meet the following equation:

where

At t7, when the voltage of Cr is Vin, the D2 begins to work, the voltage of the leakage inductor is fixed at (Lk+ Lr)Uin/Lk. From equation (15) and (16). We can see that the time interval of model 7 can be given by

Model 8〔 t7~ t8〕 At t7, the voltage of S2 decreases to zero, the anti-parallel diode D2 begins to work, the current through the transformer will be reduced to zero by the capacitor C2.

In this model, the current of Lr3 should meet the following equation:

The current of leakage inductor can be given by

Model 9〔 t8~ t10〕 At t8, the current through the transformer is zero. The resonant tank composed of Cr,Lr3 and Lr2 will begin to work, and the current through Lr3 will change the direction. At t9, when turning off S3, the S3 is in ZCS model. After half of the resonant period, the current of Lr3 decreases back to zero and the anti-parallel diode D3 turns off natu rally. The time interval of this model can be given by

The work process of S2 is accordant with above, so in this paper the work process of S1 is mainly discussed.

Fig.3 The equivalent circuits of the work process by S1

2 The Discussion to the Circuit Model

2.1 The Duty Ratio Loss

The duty ratio loss is concentrated in time interval t0 to t1, therefore the duty ratio loss is

where Ts is the switch cycle period.

2.2 Minimum Duty Ratio

To ensure soft switching off, there should be enough time for the current of S1 to decrease to zero before the switch turns off. From model 3, equation (8), we can deduce the minimum duty ratio is

2.3 Soft Commutation Conditions

1)From the analysis for model 4, 5 and equation (8) and (9), we can see that, if there is enough time for S1 to realize turning at zero current, the maximum current of the resonant network must meet the following expression:

2)If the output current Io is small, and the Io meet the following expression:

From equation (15), we know that the voltage of Cr will not increase to Uin, the D2 would not conduct, the time interval of model 7 would delay until the current of the Lk decreases to zero, therefore the model 8 would disappeared. But still the IGBT is switched in ZCS, and the D3 turns off naturally.

3)From the above analysis to topology, we can see that in the topology, if the maximum current is larger enough to meet the expression (27), and the time t4 correspended to main switch turning off satisfies the following condition:

and the time t9 correspended to auxiliary switch turning off meets the following condition:

then the main switch and auxiliary switch are all well in zero-current switch. The resonant inductors Lr1 to Lr4 do not only slow down the increasing rate of the current when switching on, but also realize soft-switch when the switch turns off. This is realized through making the anti-parallel diode conduct by the resonant network.

3 Experiment Results

To verify the operation and the performance of the proposed improved half-bridge converter, the 1 kW prototype has been implemented, the following are main parameters

Input voltage Uin, 232 V;

Output voltage, 80 V;

Output resistance value, 6 Ω ;

Switching frequency fs, 80 kHz;

Leakage inductor value, 5 μ H;

The resonant inductor, 1 μ H;

Resonant capacitor is 72 nF.

Fig.4 is the voltage and current waveform when the switch working. Fig.4(a) is for the main switch and fig.4(b) for auxiliary switch. From the waveform presented, we can see that main switch and auxiliary switch are well done in zero-current switch, and the stress of the current and voltage is small.

(The abscissa is time, and the ordinate is voltage and current, the scale of the voltage is 50V/div and the voltage wave form is marked by " □ " )

4 Conclusion

From the theoretical analysis and experiment result, we can see that the topology has following feature:

- Because the resonant inductors Lr1 to Lr4 are in series with switches, they cooperate with leakage inductor Lk that slow down the change rate of the current. Therefore the current stress has been reduced when the switches turn on.

- The resonant inductors Lr1 to Lr4 finish the soft switch in cooperation with the Cr.

- The anti-parallel diodes work in soft-switch state.

- The topology is not strict with the leakage inductor.

- The topology is adapted to improve the IGBT work frequency.

本站声明: 本文章由作者或相关机构授权发布,目的在于传递更多信息,并不代表本站赞同其观点,本站亦不保证或承诺内容真实性等。需要转载请联系该专栏作者,如若文章内容侵犯您的权益,请及时联系本站删除。
换一批
延伸阅读

9月2日消息,不造车的华为或将催生出更大的独角兽公司,随着阿维塔和赛力斯的入局,华为引望愈发显得引人瞩目。

关键字: 阿维塔 塞力斯 华为

加利福尼亚州圣克拉拉县2024年8月30日 /美通社/ -- 数字化转型技术解决方案公司Trianz今天宣布,该公司与Amazon Web Services (AWS)签订了...

关键字: AWS AN BSP 数字化

伦敦2024年8月29日 /美通社/ -- 英国汽车技术公司SODA.Auto推出其旗舰产品SODA V,这是全球首款涵盖汽车工程师从创意到认证的所有需求的工具,可用于创建软件定义汽车。 SODA V工具的开发耗时1.5...

关键字: 汽车 人工智能 智能驱动 BSP

北京2024年8月28日 /美通社/ -- 越来越多用户希望企业业务能7×24不间断运行,同时企业却面临越来越多业务中断的风险,如企业系统复杂性的增加,频繁的功能更新和发布等。如何确保业务连续性,提升韧性,成...

关键字: 亚马逊 解密 控制平面 BSP

8月30日消息,据媒体报道,腾讯和网易近期正在缩减他们对日本游戏市场的投资。

关键字: 腾讯 编码器 CPU

8月28日消息,今天上午,2024中国国际大数据产业博览会开幕式在贵阳举行,华为董事、质量流程IT总裁陶景文发表了演讲。

关键字: 华为 12nm EDA 半导体

8月28日消息,在2024中国国际大数据产业博览会上,华为常务董事、华为云CEO张平安发表演讲称,数字世界的话语权最终是由生态的繁荣决定的。

关键字: 华为 12nm 手机 卫星通信

要点: 有效应对环境变化,经营业绩稳中有升 落实提质增效举措,毛利润率延续升势 战略布局成效显著,战新业务引领增长 以科技创新为引领,提升企业核心竞争力 坚持高质量发展策略,塑强核心竞争优势...

关键字: 通信 BSP 电信运营商 数字经济

北京2024年8月27日 /美通社/ -- 8月21日,由中央广播电视总台与中国电影电视技术学会联合牵头组建的NVI技术创新联盟在BIRTV2024超高清全产业链发展研讨会上宣布正式成立。 活动现场 NVI技术创新联...

关键字: VI 传输协议 音频 BSP

北京2024年8月27日 /美通社/ -- 在8月23日举办的2024年长三角生态绿色一体化发展示范区联合招商会上,软通动力信息技术(集团)股份有限公司(以下简称"软通动力")与长三角投资(上海)有限...

关键字: BSP 信息技术
关闭
关闭